Why power access is critical to data center site locations
Construction Dive
AI SUMMARY
Power availability is a major constraint limiting where data centers can be built as demand surges. Site selection requires careful assessment of local energy infrastructure and potential onsite generation risks.
FROM THE ARTICLE
Data center leaders at Gallagher, a Chicago-based consulting firm, discuss energy constraints on the construction boom and onsite risks.
This story was originally published by Construction Dive.
Read Full Story on Construction DiveRelated Stories
Autonomous EquipmentAIR to use Elmo Motion Control technology in uncrewed cargo aircraftRobotics Business ReviewElectrification & Net ZeroBluetooth Ventilation FanJLC OnlineElectrification & Net ZeroHow to achieve high voltage in industrial systems without high complexityRobotics Business ReviewElectrification & Net Zero70 Years on the Open RoadAGC of America News
