Skanska Lands $1B Contract to Replace Boston's 95-Year-Old Rail Bridges
Equipment World
AI SUMMARY
Skanska won a $1 billion design-build contract to replace two 95-year-old bascule bridges in Boston with three modern vertical-lift spans. The project modernizes critical rail infrastructure while maintaining traffic flow through the replacement of historic structures.
FROM THE ARTICLE
The design-build contract will replace a pair of historic bascule bridges with three vertical-lift spans.
This story was originally published by Equipment World.
Read Full Story on Equipment World