New Mississippi River Bridge Opens Ahead of Schedule to Connect Iowa, Wisconsin

Equipment World
Share
AI SUMMARY

A $165 million Mississippi River bridge connecting Iowa and Wisconsin opened ahead of schedule, replacing a 95-year-old structure. The new span features wider lanes and shoulders to improve traffic flow and safety.

FROM THE ARTICLE

The $165 million span replaces a 95-year-old bridge with wider lanes and shoulders.

This story was originally published by Equipment World.

Read Full Story on Equipment World